Port Harcourt BESS Site

Port Harcourt, Rivers 2025 2.5 MWh
Summary

A 2.5 MWh battery energy storage system providing peak shaving and backup for a critical industrial site.

The Challenge

Peak-hour tariff spikes and grid instability were forcing the client to run diesel for 6+ hours daily, with high fuel and emissions cost.

Our Solution

Containerized 2.5 MWh lithium BESS with bidirectional inverters, intelligent EMS for peak shaving, and seamless grid/diesel/storage transfer.

The Outcome

Diesel runtime cut by 84% and peak-demand charges reduced by 47%, with sub-20 ms transfer keeping production lines uninterrupted.