Ikeja Factory PV Plant

Ikeja, Lagos 2024 1.2 MW · Grid-Tied
Summary

A grid-tied 1.2 MW rooftop plant supplying daytime production loads at a high-volume manufacturing facility.

The Challenge

Rising tariffs and load-shedding were eroding margins on a 24-hour production line. The client needed predictable energy costs without sacrificing capacity.

Our Solution

Engineered a 1.2 MW grid-tied solar plant with smart string inverters and SCADA-grade monitoring, integrated cleanly with the existing utility supply.

The Outcome

Daytime energy cost reduced by 58%, with a projected ₦920M in savings over the system's 25-year design life.